Request More Information Contact the Seller
- RE: Immersive 1:1 LED Walkthroughs & Event Venue For AEC, Builders, Designers & Developers - Reduce Change Orders, Accelerate Sales
- Contact: Chris Mercier
Quick Facts
| Asking Price: | $500,000 | |
| Annual Revenue: | Not Disclosed | |
| Net Profit: | Not Disclosed | |
| Cash Flow: | Not Disclosed | |
| Total Debt: | Not Disclosed | |
| FF&E: | $350,000 | |
| Real Estate: | Not Disclosed | |
| Year Established: | Not Disclosed | |
| Employees: | Not Disclosed | |
| BBN Listing #: | SB-58661 | |
| Broker Reference #: | STLOUIS001-58661 |
Business Overview:
True Scale USA is a first-to-market, technology-driven facility that solves the "spatial gap" in design and construction. Utilizing a massive 1,200 sq. ft. interactive LED floor and a 22-foot cinematic projection screen, True Scale allows clients to walk through their blueprints at a 1:1 scale before a single nail is driven. This "Measure Twice, Build Once" innovation eliminates costly change orders, enhances client confidence, and serves as a high-tech hub for the construction, design, and entertainment industries. Key Vertical Markets & Value Propositions 1. Engineering & Construction: "The Change-Order Killer" For structural engineers and general contractors, True Scale is a critical risk-mitigation tool. Physical Verification: Walk through complex mechanical, electrical, and plumbing (MEP) layouts to identify spatial conflicts. Subcontractor Coordination: Host pre-con meetings where every trade can stand on the "slab" together to finalize logistics. 2. Interior Design & Landscaping: "The Ultimate Showroom" Move beyond 2D sketches and small VR headsets. True-Scale Staging: Designers can place physical or digital furniture on the LED floor to test flow, clearances, and sightlines. Landscape Immersion: Hardscape and pool layouts are projected at life-size, allowing homeowners to feel the scale of their outdoor living spaces. 3. Real Estate & Development: "Accelerated Pre-Sales" Interactive Sales Center: Developers can bring prospective buyers into "unbuilt" luxury condos or commercial spaces, allowing them to choose finishes and layouts in real-time, significantly shortening the sales cycle. 4. Entertainment & Corporate Events: "A Venue Like No Other" The facility’s tech stack makes it a premier destination for high-impact events. Immersive Hosting: From corporate product launches and training workshops to high-end private celebrations (Valentine’s events, fundraisers, etc.). Cinematic Experience: The 22-foot screen and LED floor create a "Wow Factor" that traditional hotel ballrooms cannot replicate. Business Assets & Highlights State-of-the-Art Technology: Proprietary integration of large-scale LED flooring and flexible wall configurations. Strategic Location: Minutes from Downtown St. Charles; serving the rapidly growing St. Charles and Lincoln County corridors. Diversified Revenue Streams: High-margin blueprint visualization fees coupled with premium event venue rentals. Operational Simplicity: A turnkey operation with established workflows for converting CAD/PDF files into immersive floor plans. The Opportunity True Scale USA is more than a local service; it is a scalable model. A new owner has the opportunity to franchise this concept to major metropolitan areas or integrate it into an existing architecture/engineering firm to provide a massive competitive advantage. As the industry moves toward "Digital Twins" and virtual construction, True Scale USA is the only bridge that brings those digital assets into the physical world.
Contact the Seller:
To request more information regarding this listing, simply check the ADD TO REQUEST INFO BASKET button (above Quick Facts) and when you are done searching and have made all your selections, simply click on the REQUEST FREE INFO button at the bottom of this page.
Property Features and Assets:
Utilizing a massive 1,200 sq. ft. interactive LED floor and a 22-foot cinematic projection screen
Market Competition and Expansion:
First in Market
Reason for Selling:
Kindly ask the seller for more information.Additional Details:
- The property is owned.
- This is not homebased business opportunity.
- This is not a franchise resale opportunity
Relevant Links:
- View more businesses for sale
- View more Businesses For Sale in the same industry
- Sell a business online
- Find a business broker
Request More Information
